- Home
- Electrical
- Headlamps Beam Units & Accessories
- Halogen Bulb Connector Pre-wired Block With Long Leads
Halogen Bulb Connector Pre-wired Block With Long Leads
Code: 13125 (D6)
- £5.30 £4.41
- |
- |
- (%)
Item in Stock
Item out of Stock
|
Usually dispatched within 2-3 Days
Loading...
- Pre-wired Halogen Bulb Connector Block
- 3 Pin with Long Wiring
- Excellent Quality
Halogen Bulb Connector Pre-wired 3 Pin With Extra Long Cables. Excellent Quality
UK Delivery Options
Royal Mail Recorded Delivery (2-3 Working Days Delivery) Delivery Charges are confirmed at the checkout.
International Delivery
Delivery outside the UK (including USA, Canada & Australia) We offer worldwide shipping via Royal Mail or Fedex. We always aim to dispatch your item within one working day of payment being received. Please allow 7 – 10 working days to arrive depending on your country and local customs.
Returns
Please see our Delivery & Returns page for more information
100% Secure Shopping. All major cards accepted and Paypal.